industrial gas fired water tube hot water boiler

industrial gas fired water tube hot water boiler

After the gas industrial fired water tube hot water boiler hot water boiler vaporization emergency 1. Vaporization handler circulating pump stops abnormally pump failure caused by: ① blower stops running immediately. ② immediately open the door, take measures to pressure the fire, lift the chute gate, cutting off the supply of coal grate. ③ In the case of boiler pressure not greater than 0.6MPa (600KPa), the exhaust valve to follow, only a sharp rise in pressure in the boiler deflated, used only relief exceeds 0.9MPa, and the exhaust process to be carried out slowly, prevention boiler due to loss of pressure and more violently again vaporized. ④ close the boiler water, water main gas valve. ⑤ open stop valve recirculation line, to ensure that the water supply pipe velocity convection heating surface (economizer) to prevent re-vaporization of the economizer. ⑥ The operation of the above operation, at the same time to pay the boiler to reduce the boiler water temperature and the furnace pressure. ⑦ After the boiler pressure is normal, i.e., opening the standby circulating pump, into the normal combustion. 2. Treatment failure or sudden loss of power boiler vaporization of power: ① immediately open the door, lift the coal chute slide gate to take pressure fire measures to reduce the oven temperature. ② Grate with the fastest speed in order in the shortest time to fire onto the slag tap. ③ the degree of treatment in the first case. Once a short time can not supply heating network system, antifreeze should take emergency measures. 3. Due to excessive heat boiler boiler vaporization process: ① the immediate closure of the drum, induced draft fan. ② immediately open the door, take measures to pressure the fire, lift the supply of coal chute slide gate, off of coal, while the grate into fast gear. ③ In the case confirmed the presence of water, the boiler can supply water to the boiler body, boiler out of the water while closing the main valve. ④ Open line stop valve recirculation pump to ensure water velocity convection heating surface of the pipe, to prevent the economizer again vaporized. ⑤ Open circulating pump with jog mode, jog each time less than 30 seconds, again less than one minute jog interval. Jog purpose is to reduce the boiler water temperature, while preventing a large amount of steam into the pipeline system. ⑥ back into place after the safety valve, circulating pump running, and then the normal burning stove. 4. Water boiler system run vaporization process due to water loss, loss of pressure caused by: ① immediately closed drum, induced draft fan. ② out of the water while closing the main valve and the boiler circulating pump. ③ take the same measures to cool the furnace tube described above. ④ Open stop valve recirculation line. ⑤ rely exhaust valve until the safety valve back into place. ⑥ until the boiler water temperature drops below 50 ℃, when the temperature of the furnace temperature less number 200 ℃, again within the boiler feed water, water course to be carried out slowly, to prevent harm to the boiler when the temperature is too large. ⑦ After processing leakage fault, the system time to the replenishment, and out of the water boiler always open the valve, and the circulating pump, and then normal combustion.

Diqing in Yunnan Nonferrous Metals Co., Ltd. mainly engaged in Pulang copper mining, site selection, sales and other items. As we all know, in the copper smelting process, it consumes a lot of electricity and thermal power resources, which account for most of the hot water consumption. Combined with the actual demand Diqing company, to provide fast Boiler 1 stage electric heating industrial fired water tube hot water boiler of 2.1MW.

After the gas industrial fired water tube hot water boiler hot water boiler vaporization emergency 1. Vaporization handler circulating pump stops abnormally pump failure caused by: ① blower stops running immediately. ② immediately open the door, take measures to pressure the fire, lift the chute gate, cutting off the supply of coal grate. ③ In the case of boiler pressure not greater than 0.6MPa (600KPa), the exhaust valve to follow, only a sharp rise in pressure in the boiler deflated, used only relief exceeds 0.9MPa, and the exhaust process to be carried out slowly, prevention boiler due to loss of pressure and more violently again vaporized. ④ close the boiler water, water main gas valve. ⑤ open stop valve recirculation line, to ensure that the water supply pipe velocity convection heating surface (economizer) to prevent re-vaporization of the economizer. ⑥ The operation of the above operation, at the same time to pay the boiler to reduce the boiler water temperature and the furnace pressure. ⑦ After the boiler pressure is normal, i.e., opening the standby circulating pump, into the normal combustion. 2. Treatment failure or sudden loss of power boiler vaporization of power: ① immediately open the door, lift the coal chute slide gate to take pressure fire measures to reduce the oven temperature. ② Grate with the fastest speed in order in the shortest time to fire onto the slag tap. ③ the degree of treatment in the first case. Once a short time can not supply heating network system, antifreeze should take emergency measures. 3. Due to excessive heat boiler boiler vaporization process: ① the immediate closure of the drum, induced draft fan. ② immediately open the door, take measures to pressure the fire, lift the supply of coal chute slide gate, off of coal, while the grate into fast gear. ③ In the case confirmed the presence of water, the boiler can supply water to the boiler body, boiler out of the water while closing the main valve. ④ Open line stop valve recirculation pump to ensure water velocity convection heating surface of the pipe, to prevent the economizer again vaporized. ⑤ Open circulating pump with jog mode, jog each time less than 30 seconds, again less than one minute jog interval. Jog purpose is to reduce the boiler water temperature, while preventing a large amount of steam into the pipeline system. ⑥ back into place after the safety valve, circulating pump running, and then the normal burning stove. 4. Water boiler system run vaporization process due to water loss, loss of pressure caused by: ① immediately closed drum, induced draft fan. ② out of the water while closing the main valve and the boiler circulating pump. ③ take the same measures to cool the furnace tube described above. ④ Open stop valve recirculation line. ⑤ rely exhaust valve until the safety valve back into place. ⑥ until the boiler water temperature drops below 50 ℃, when the temperature of the furnace temperature less number 200 ℃, again within the boiler feed water, water course to be carried out slowly, to prevent harm to the boiler when the temperature is too large. ⑦ After processing leakage fault, the system time to the replenishment, and out of the water boiler always open the valve, and the circulating pump, and then normal combustion.

(2) major components: the gas burner 5 is constructed of the following system components: 1, the function that the air supply system, air supply system into the wind speed a certain amount of air to the combustion chamber, its main components are: a housing, the fan motor, fan impeller, air guns fire tube, damper controller, damper baffle, a cam adjusting mechanism diffuser plate. 2, the ignition system functions in that the ignition system ignites a mixture of air and fuel, its main components are: the ignition transformer, the ignition electrode, a high voltage electrical cable fire. 3, system monitoring function monitoring system is to ensure that the burner safe and stable operation, the main components are flame detectors, pressure monitors, temperature monitors and the like. 4, functions of the fuel system of the fuel system is to ensure that the desired fuel burner. The fuel oil burner system are: tubing and fittings, pumps, solenoid valves, nozzles, heavy oil preheater. The gas burner mainly a filter, pressure regulator, solenoid valve, and then firing solenoid valve, the fuel valve. 5, electronic control system electronic control system command center and the focal the above system, the primary control element is a control box, with different programmer for different burners, the common programmer has: LFL series, the LAL series, LOA series, LGB series, the main difference is the time of each different program steps. 1, AC 220V power supply is turned on, the buzzer beeps once. 2, press the start button, the buzzer sounds, power controller, the LCD display is opened. At this time, the controller is in standby. 3, the controller opens, through the keyboard operator can enter the running state (open furnace), out of service state (shutdown), the pump manually set the time, access to the recording operation of the alarm and the like. Fireman who usually just press the start key to start the oven, press the stop button shutdown, is very simple. 4, press the start button, to enter the running state, the controller controls the start and stop of the burner according state boiler water temperature, controlling start and stop the pump in accordance with the temperature of boiler water level or state. 5, press Stop key to exit the operating state, the controller closes the burner and the pump (with the exception of pump delay). 6, in the standby state or alarm press the stop button, the LCD display is turned off, the controller off. 7, manually operated pump device selection key press, the pump mark blinks to indicate that the selected pump operation. Proceed as + key auto / manual switch (when the pump is in the manual mode, the pump below the graphic display flag Manual); button can also be provided to manually activate or deactivate the pump (pump case immediately into the manual mode). Press the device selection key to exit the pump operation.

industrial gas fired water tube hot water boiler Related Information

Hot Water Boilers (Water Wall) - Parker Boiler Co

WATER WALL HOT WATER BOILERS Our Water Wall Hot Water Boilers offer a water tube design which is extremely efficient and reliable The Parker Water Wall Hot Water Boilers offer a water tube design which is extremely efficient and reliable. Our hot water boilers are built for the a long service life as well as easy maintenance. Compare ours to the competi

Get a Quote

new industrial oil fired hot water boiler simply in

Boiler Distributor:new industrial oil fired hot water boiler simply Description. With more than 30 years of manufacturing boilers, the company has formed more than 400 varieties of gas boilers, biomass boilers, coal-fired boilers, heat-conducting oil boilers, etc., and is widely used in chemical, food, brewing, heating, papermaking

Get a Quote

Industrial Boiler Systems Hurst Boiler

Hurst Boiler, Inc. is the leading manufacturer of gas, oil, wood, coal, solid fuel, solid waste, biomass and hybrid fuel-fired steam and hot water boilers. Hurst Boiler has been designated as an Essential Provider and available 24/7 during these difficult times.

Get a Quote

What is a Boiler and How does it Work? RealPars

The function of a boiler is to either produce hot water or steam. In this article, we are going to discover what an industrial boiler is, and how it works. The function of a boiler is to either produce hot water or steam. SHOP; lets have a look at a water-tube boiler. Gas-fired boilers work by using either propane or natural gas,

Get a Quote

Hot Water Boilers (Water Wall) - Parker Boiler Co

The Parker Water Tube Design offers an extremely efficient, reliable hot water boiler built for the long term with ease of maintenance. The Parker design offers many advantages. The cabinet is durably constructed with heavy steel, insulated with high temperature thermal fiber insulation to effectively reduce heat losses to a minimum.

Get a Quote

industrial fired hot water boiler - ZOZEN Boiler

40t/h ~5 ton boiler for beverage industry Propane Fired Boiler jute industrial thermal oil boiler for beverage industry Except hot oil boiler, oil gas fired steam boiler and biomass water tube steam boiler is also suitable for textile factories. 40t/h jute industrial boiler in Food Industry. 40t/h jute [email protected] > Get A Quote >

Get a Quote

Oil Gas Fired Vacuum Hot Water Boiler - Industrial

Industrial Hot Water Boiler Vacuum Hot Water Boiler Thermal Power: 350~2800 kw, ZZJ Series Thermal Power: 3500~14000 kw, ZLJ Series Micro positive pressure chamber combustion Thermal Efficiency: >95.5% Fuel: Natural gas, coke oven gas, city gas, light oil, heavy oil, palm oil Get a Quote! Send Email Introduction of Vacuum Hot Water Boiler Vacuum hot Oil Gas Fired Vacuum Hot Water Boiler

Get a Quote

industrial gas oil fired water tube water boiler dealer

Papermaking Gas Hot Water Fire Tube Boiler Dealer. water tube boilers for sale in south africa structure oil gas fired water tube steam boiler. the . Free Online Consultation; Dual Fuel Fired Boiler Supplier In Peru Find Best In South . 1 ton oil fired hot water boiler in South Africa industrial boiler company20 ton wns oil gas Papermaking Gas

Get a Quote

Industrial Gas Fired Water Tube Steam Boilers

ZOZEN is one of the best modern boiler manufacturers in China, our products include steam boilers, hot water boilers and thermal fluid heaters. ZOZEN boiler is located in Wuxi, covers 150 thousand square meters of production area, equipped with first-class production equipment, passed the ISO9001:2000 international quality system certification.

Get a Quote

Industrial Gas Fired Boiler, Oil Fired Boiler, Gas & Oil

2020-3-20 · As a leader in industrial boiler manufacturers, offers 0.5-130 ton with pressure up to 9.81MPa / 98.1bar industrial gas and oil steam boilers, hot water boilers and power plant boilers. Flexible fuels: natural gas, heavy oil, light oil, coke oven gas, blast furnace gas, or dual fuel (burning gas and oil). Widely used in industry process steam and hot water providing, like food processing

Get a Quote

Hot Water Boilers (Water Wall) - Parker Boiler Co

WATER WALL HOT WATER BOILERS Our Water Wall Hot Water Boilers offer a water tube design which is extremely efficient and reliable The Parker Water Wall Hot Water Boilers offer a water tube design which is extremely efficient and reliable. Our hot water boilers are built for the a long service life as well as easy maintenance. Compare ours to the competi

Get a Quote

industrial fired hot water boiler - ZOZEN Boiler

40t/h ~5 ton boiler for beverage industry Propane Fired Boiler jute industrial thermal oil boiler for beverage industry Except hot oil boiler, oil gas fired steam boiler and biomass water tube steam boiler is also suitable for textile factories. 40t/h jute industrial boiler in Food Industry. 40t/h jute [email protected] > Get A Quote >

Get a Quote

Oil Gas Fired Vacuum Hot Water Boiler - Industrial

Industrial Hot Water Boiler Vacuum Hot Water Boiler Thermal Power: 350~2800 kw, ZZJ Series Thermal Power: 3500~14000 kw, ZLJ Series Micro positive pressure chamber combustion Thermal Efficiency: >95.5% Fuel: Natural gas, coke oven gas, city gas, light oil, heavy oil, palm oil Get a Quote! Send Email Introduction of Vacuum Hot Water Boiler Vacuum hot Oil Gas Fired Vacuum Hot Water Boiler

Get a Quote

Oil Gas Fired Vacuum Hot Water Boiler - Industrial

Industrial Hot Water Boiler Vacuum Hot Water Boiler Thermal Power: 350~2800 kw, ZZJ Series Thermal Power: 3500~14000 kw, ZLJ Series Micro positive pressure chamber combustion Thermal Efficiency: >95.5% Fuel: Natural gas, coke oven gas, city gas, light oil, heavy oil, palm oil Get a Quote! Send Email Introduction of Vacuum Hot Water Boiler Vacuum hot Oil Gas Fired Vacuum Hot Water Boiler

Get a Quote

Oil Gas Fired Vacuum Hot Water Boiler - Industrial

Industrial Hot Water Boiler Vacuum Hot Water Boiler Thermal Power: 350~2800 kw, ZZJ Series Thermal Power: 3500~14000 kw, ZLJ Series Micro positive pressure chamber combustion Thermal Efficiency: >95.5% Fuel: Natural gas, coke oven gas, city gas, light oil, heavy oil, palm oil Get a Quote! Send Email Introduction of Vacuum Hot Water Boiler Vacuum hot Oil Gas Fired Vacuum Hot Water Boiler

Get a Quote

Do You Want To Get An Exclusive Project Plan ?

7 * 24 * 365 endless service, click the button to provide you with professional and fast solutions at any time

Scroll to Top